Location: 0 Plymouth Street, Carver MA

Screen Shot 2025-04-14 at 3.36.26 PM.jpg
  • Owner:  North Weston Cranberry/Eric and Elaine Weston

  • Volume of Earth Removed: Unknown to date

  • Permit: Carver Earth Removal permit issued Nov. 2021 for 120,000 cubic yards (market value about $2 million). Weston submitted a plan dated 2010 and it was accepted by the ERC for the permit application. Submitting this plan violated basic professional engineering standards. The engineer that produced and stamped the plan, Ben Gilmore, is deceased, conveniently for the ERC and the Westons.

  • Area Impacted: 

  • Claimed Reason for Mining: Create reservoir for cranberry agriculture. Is clearing upland forest for mining with no connection to agricultural use, as of July 2023. Trucking operations being done by SLT Construction.

  • Solar: Yes, approved for a dual use solar project

  • Water Supply: Abutting private drinking water wells

  • Plymouth Carver Sole Source Aquifer: yes

  • Wetlands and Waterways: Yes wetlands; MassDEP ruled in 2022 the mining is normal improvement of land in agricultural use and exempt from the Wetlands Protection Act. 

  • Archaeological Impacts: Unknown

  • Environmental Justice Population: Unknown

  • Ecosystem: Unknown

  • Website Blog

  • Public Subsidies:

    • Agricultural Subsidies: yes

    • Solar Subsidies: yes​​ 


​

We are a statewide network of groups and individuals taking action to protect our land and water to ensure a livable future for all life on Earth.

  • Instagram
  • Facebook
  • Twitter
  • YouTube

© 2023 by Make A Change.
Proudly created with Wix.com

Give Us Your Feedback
Please share your experience with sand mining in Southeastern MA

Thanks for sharing your feedback with us!

bottom of page